Manufacturing · Industrial IoT
IoT and Industrial IoT Platform DevelopmentMachines, sensors and vehicles connected to dashboards, alerts and AI your teams use.
We build IoT and industrial IoT platforms: device and PLC connectivity, edge gateways, time-series data, OEE and energy dashboards, alerts and predictive maintenance, integrated with your ERP and maintenance systems.
- PLC and sensor connectivity
- OEE and energy dashboards
- Predictive maintenance
- Real-time
- machine and sensor data
- 8–12 wks
- to a first line connected
- Edge
- buffering for poor networks
- 1 day
- senior specialist reply
What is an industrial IoT platform?
An industrial IoT (IIoT) platform collects data from machines, PLCs, sensors and meters, sends it securely to the cloud or an on-premises server, stores it as time-series data and turns it into dashboards, alerts and analytics such as OEE, energy use and predictive maintenance. Stack18 builds IIoT platforms integrated with ERP, MES and maintenance systems.
- industrial IoT development India
- IIoT platform development
- OEE monitoring system
- machine monitoring software
- predictive maintenance IoT
| What it covers | Device connectivity; Edge and cloud; Time-series data; OEE and energy dashboards; Alerts and predictive maintenance. |
|---|---|
| Typical first step | Discovery Sprint: 2 weeks; fixed price. |
| Ready-made route | Supply Chain OS Launch: 4–5 weeks; from ₹2.3L, one-time. |
| Long-term option | Enterprise Transformation Pod: 12–36 months; annual contract. |
| Measured by | OEE; Unplanned downtime; Energy per unit; Time to detect faults. Each against an agreed baseline. |
| Governance | Human approval at 5 governance gates before anything reaches production. NDA available on request. |
| Delivery team | Based in Jaipur, India. A senior specialist replies within one business day. |
You need this when…
Tap the ones that apply to you.
IoT and Industrial IoT Platform Development, end to end.
The building blocks of a IoT and Industrial IoT Platform Development engagement. Each is delivered by the same team on the Agentic SDLC, with your approval at every critical step.
Device connectivity
Connect PLCs, sensors and meters over OPC UA, Modbus and MQTT, including older machines through retrofits.
- OPC UA and Modbus
- MQTT
- Retrofit sensors
Edge and cloud
Edge gateways buffer data through network drops and send it to cloud or on-premises servers.
- Edge gateways
- Buffering
- Secure transport
Time-series data
Store high-frequency data efficiently for dashboards and analysis.
- Time-series database
- Retention tiers
- Data quality
OEE and energy dashboards
Line, plant and company dashboards for OEE, downtime reasons and energy.
- OEE
- Downtime reasons
- Energy per unit
Alerts and predictive maintenance
Threshold and anomaly alerts, then models that predict failures from vibration, temperature or current.
- Alerts
- Anomaly detection
- Failure prediction
ERP and maintenance integration
Connect production counts and maintenance work orders with ERP and CMMS.
- ERP sync
- Work orders
- Spares planning
IoT and Industrial IoT Platform Development: audiences, benefits, use cases and technology.
Who usually starts this work, what changes for the business, the most common use cases and the technology we typically use.
Who it is for
- Plant heads and COOs
- Maintenance managers
- Manufacturing IT and OT teams
- Energy and sustainability leads
Business benefits
- See downtime as it happens. Supervisors act on stoppages in minutes.
- Lower energy cost. Energy per unit shows waste by line and shift.
- Less unplanned downtime. Alerts and predictions move maintenance from reactive to planned.
- One view across plants. Comparable OEE across lines and sites.
Common use cases
- OEE and downtime monitoring
- Energy monitoring by line
- Predictive maintenance
- Cold-chain and warehouse monitoring
- Fleet and asset tracking
Technologies we use
- OPC UA, Modbus and MQTT
- Edge gateways
- AWS IoT Core and Azure IoT Hub
- TimescaleDB and InfluxDB
- Grafana and custom dashboards
- Python ML for predictive maintenance
Compare the tools behind IoT and Industrial IoT Platform Development.
Independent, sourced profiles from the Stack18 Marketplace. We are tool-neutral and recommend after discovery.
A typical engagement, step by step.
Senior people lead every phase. Specialised AI agents on the Agentic SDLC handle the repetitive work, and nothing ships without your approval.
Survey
We survey machines, protocols, networks and data needs on one line and agree baseline metrics.
Design
We design connectivity, edge, data model and dashboards, and order any retrofit hardware.
Connect and build
We connect the line, build dashboards and alerts and validate data with supervisors.
Scale
We roll out to more lines and plants and add predictive models once enough history exists.
- Fixed-price first stepScope, timeline and price agreed before the build starts.
- Working software every weekA demo you can click, not a status report.
- Your approval at every critical gateAI agents do the repetitive work. Nothing ships without a person signing off.
How much does IoT and Industrial IoT Platform Development cost in India?
Most IoT and Industrial IoT Platform Development projects start with a Discovery Sprint (2 weeks, fixed price), which fixes the scope, team and price before you commit. Supply Chain OS Launch costs from ₹2.3l, one-time and typically takes 4–5 weeks. Enterprise Transformation Pod engagements run 12–36 months on an annual contract. Prices exclude GST. Cloud hosting and third-party usage, such as messaging, payment or AI model charges, are paid at cost.
Discovery Sprint
Teams deciding scope, priorities and cost for iot and industrial iot platform development before committing to a build.
- Duration
- 2 weeks
- Pricing
- Fixed price
- Scope and baseline
- Targets agreed
- Fixed-price plan
Supply Chain OS Launch
Teams that want a proven, ready-made base that goes live fast and can be extended later.
- Duration
- 4–5 weeks
- Pricing
- From ₹2.3l, one-time
- Ready-made modules
- Configured to your process
- Extend later
Enterprise Transformation Pod
Organisations running iot and industrial iot platform development across several teams, sites or systems over years.
- Duration
- 12–36 months
- Pricing
- Annual contract
- Dedicated team
- Quarterly reviews
- One partner
What drives the price
- Number and age of machines
- Protocols and retrofit hardware
- Network conditions on the shop floor
- Cloud or on-premises hosting
- Analytics and prediction scope
Always included
- Fixed scope and price before build starts
- Weekly working demos and human approval gates
- Training, documentation and 30 days of hypercare
- Your code, data and IP, owned by you
See Stack18 pricing or compare fixed price and time and materials.
What we have shipped, and what a typical engagement looks like.
Delivered projects link to the full case study. Illustrative scenarios describe typical engagements and are not named client results.
Auto components manufacturer
- Challenge
- Downtime is logged by hand at the end of each shift.
- What we do
- PLC data feeds a live OEE dashboard with downtime reasons captured on a tablet at each machine.
- We would measure
- oee, unplanned downtime, energy per unit, against a baseline agreed in week one.
8–10 weeks
Textile mill
- Challenge
- Energy costs vary widely between similar lines.
- What we do
- Smart meters per line and an energy dashboard show energy per kilogram and flag abnormal consumption.
- We would measure
- oee, unplanned downtime, energy per unit, against a baseline agreed in week one.
8–12 weeks
Ethnic wear D2C, Jaipur
- Challenge
- A ₹100+ crore brand needed website, app and back office to share one catalogue and one record of stock and orders.
- What we do
- Nine specialists built website, mobile app and ERP on one connected foundation in two-week sprints.
3 months
Read the case study →We agree targets before we start.
Free plant connectivity survey plan
Tell us your machines and goals. We outline connectivity options and a first line to connect.
- Connectivity options
- Hardware list
- Pilot plan
IoT and Industrial IoT Platform Development questions.
Cost, timelines, integrations and ownership. If your question is not here, ask a senior specialist on a free 30-minute call.
Ask us anythingCan old machines be connected?
Often yes, with retrofit sensors for current, vibration or counts, or by reading existing PLCs. We assess each machine during the survey.
Cloud or on-premises?
Either. Many plants buffer at the edge and send to the cloud; some prefer on-premises servers for security or connectivity reasons.
What is OEE?
Overall equipment effectiveness combines availability, performance and quality into one measure of how well a machine or line is used.
How soon can we predict failures?
Predictive models need several months of good data, including failures. We start with alerts and add predictions when history allows.
Does it integrate with our ERP?
Yes. Production counts and maintenance work orders can sync with your ERP and maintenance systems.
How is it priced?
A fixed-price Discovery Sprint and line survey, then a fixed price per phase. Hardware is quoted separately at cost.
Do you work with plants across India?
Yes. Stack18 is based in Jaipur and works with manufacturers across India, with on-site surveys.
Let's scope your IoT and Industrial IoT Platform Development project.
Tell us where you are and where you want to be. A senior specialist will reply within one business day with next steps.
- Free 30-minute consultation
- Indicative estimate after the call
- NDA available on request